COMPLETED & ONGOING

pROJECTS

September 2020 – present

Liquefied Natural Gas (LNG) Plant

  • HDPE piping installation including Butt fusion and electro fusion welding
  • PVC piping and valve installation.
  • Power cable laying and termination.
  • Pre commissioned and commissioned 40 m3/hr of containerized demineralized water treatment system.
  • Efficiently Operating and maintaining 40 m3/hr demineralized water production system.
  • Maintain constant communication with End-user if required as per the site requirement on the plant operation status.
  • Perform preventative maintenance as per the PM plan and maintained the event log.
  • 24/7 emergency response within 1 hour to site and adhere to the emergency response and escalation protocol.
  • Provide support services such as accommodation and transport during the operating period.
  • Supplies water treatment consumables such as cartridge filters, strainers etc.

September 2020 – present

Chemicals and Plastics based Company

  • Perform safe operation of the unit including filtration and chlorine removal system, reverse osmosis, and chemical dosing system.
  • Daily operation data logging, visual checks, and reporting abnormalities to site lead.
  • Maintain constant communication with End-user if required as per the site requirement on the plant operation status.
  • Perform preventative maintenance as per the PM plan and maintained the event log.
  • 24/7 emergency response within 1 hour to site and adhere to the emergency response and escalation protocol.
  • Maintain inventory and stock take to ensure water treatment plant operation not interrupted.
  • Perform 1st level Troubleshoot and report to site lead.
  • 100% comply to requirements and maintain good level of housekeeping at site.

December 2021 – March 2021

Water Treatment Plant Upgrading
Project

  • Re-design RO train A and B to meet Demin Water demand.
  • Re design control philosophy of the MMF-ACF- RO system to continuously meet customer’s demand and improved system reliability to 99%
  • Upgraded controls and sequencing to be fully Automated
  • Upgraded existing control panel and auxiliaries.
  • HDPE piping modification and mechanical system upgradation.
  • Full Demin water system integration.
  • Refurbished chemical system and chemical bund.

March 2021

Oil Refinery Complex

  • Supplied Programmable Logic Controller (PLC) for RO EDI water treatment system
  • PLC programming and installation at the oil refinery complex
  • Water treatment system test run and troubleshooting.

2015 – 2020

Methanol Plant

  • Long term support service in providing accommodation, transport and consumables
  • Project supervisory support for ultra filtration (UF) cleaning system upgradation.
  • Project coordination support for water treatment chemical bund refurbishment.

September 2020

Oil & Gas Refinery Plant

  • HDPE piping installation including Butt fusion and electro fusion welding
  • PVC piping and valve installation.
  • Power cable laying and termination.
  • Pre commissioned and commissioned 60 m3/hr of containerized demineralized water treatment system.
  • Efficiently Operated and maintained 60 m3/hr demineralized water production system.
  • Maintain constant communication with End-user if required as per the site requirement on the plant operation status.
  • Perform preventative maintenance as per the PM plan and maintained the event log.
  • 24/7 emergency response within 1 hour to site and adhere to the emergency response and escalation protocol.
  • Decommissioned 60 m3/hr containerized demineralized mobile
  • Provided support services such as accommodation and transport during the operating period.
  • Supplied water treatment consumables such as cartridge filters, strainers etc.

February 2018 – June 2020

Refinery and Petrochemical Complex

  • Coordinated 500 m3/hr of containerized Demineralized water installation project.
  • Pre commissioned and commissioned 500m3/hr of containerized demineralized water treatment system.
  • Efficiently Operated and maintained 500 m3/hr demineralized water production system
  • Maintained constant communication with End-user if required as per the site requirement on the plant operation status.
  • Performed preventative maintenance as per the PM plan and maintained the event log.
  • Run 24/7 shift operations and constantly adhered to the emergency response and escalation protocol.
  • Decommissioned 500 m3/hr containerized demineralized mobile
  • Provided support services such as accommodation and transport during the operating period.
  • Supplied water treatment consumables such as cartridge filters, strainers etc.

2015 – 2020

Gas to Liquids Plant

  • Pre commissioned and commissioned 60 m3/hr of containerized demineralized water treatment system.
  • Efficiently Operated and maintained 60 m3/hr demineralized water production system.
  • Maintain constant communication with End-user if required as per the site requirement on the plant operation status.
  • Perform preventative maintenance as per the PM plan and maintained the event log.
  • 24/7 emergency response within 1 hour to site and adhere to the emergency response and escalation protocol.
  • Decommissioned 60 m3/hr containerized demineralized mobile
  • Provided support services such as accommodation and transport during the operating period.
  • Supplied water treatment consumables such as cartridge filters, strainers etc.

2019

SKB Golden Enterprise

  • Portable generator rental
  • Operated KW diesel generator
  • Supplied solar panels for a rural water supply project
  • Instrument cable termination and loop check
  • Scada programming and system integration

2016 – 2017

Project for a Multinational Electronics & Technology Company

  • New packing line installation and commissioning
  • Upgradation of the existing packing line.
  • Redesign and rewrite programming for the production line
  • Install, testing and commissioning of power system
  • Maintenance support to ensure continuous production.
Location

No 7 Jalan Sri Wangi 1/5
81750 Johor Bahru 
Johor

Contact us

Phone: +603 5103 5767
Mobile: +6019 573 1432
Email: admin@aksgreenergy.com

Our hours

9:00 AM – 5.00 PM
Monday – Friday